HM Exploration Confirms Significant Mineralization at Lewis Pilley's Project; Intersects 23 Metres of 1.2% Cu, 1.7% Zn, 10.7 g/t Ag and 0.25 g/t Au.
Assays have confirmed that the upper targeted copper-bearing debris flow contains significant mineralization over an interpreted strike length of approximately 60 m, from a total drill-tested length of approximately 135 m, within zones of massive to semi-massive sulphide through holes 1 and 2 as well as holes 5, 6, and 7. Assay values from hole 7 also confirm that the lower mineralized sulphide lens contains significant mineralization within predominantly massive to semi-massive, and minor disseminated, sulphide mineralization.
Want more?
Open NewsSnap.ai for the full app experience, including audio, personalization, and more news tools.